Bulk Fuel Upgrade Manual
Alaska Energy Authority

AEA tag

Rural Energy Group Bulk Fuel Upgrade Program

Rural Power System Upgrade Program

Project Reference Manual

(Please note: These links will take you to a site that will ask for a password. When the password prompt comes up just click your "enter" key, do not type in a password. (It may be necessary to minimize your internet screen to view the password prompt notice.)

Many of the following files are quite large and may take a bit of time to download.

Project Reference Manual Update Log

Tab 1:  Overview
Bulk Fuel Upgrade Projects Flowchart
Sample Bulk Fuel Upgrade Project Activity Checklist
Sample RPSU Project Activity Checklist
Proposed Statement of Work–Multi Disciplined Engineering Services
Bulk Fuel Upgrade Projects Diagram

Tab 2:  BFU Phase 1
Sample, Proposal for Technical Services, Phase I (Attachment)
Conceptual Design Report – Sample Table of Contents
Rural Energy Cost Estimates, October 14, 2002, Version 2
Sample, AEA Project Estimate Form
Sample, Construction Cost Estimate
Sample, BFU Budget Estimate

Tab 3:  BFU Phase 2
Proposal for Technical Services, Phase II & III (Attachment)
Construction Management Statement of Services for Solicitation AEA-02-003
Sample, Construction Management Budget Estimate
Construction Cost Estimate & Schedule
    w
/Attached Letter of Commitment to Budget & Schedule
Sample Construction Manager Design Review Report
Prototype Drawings

Tab 4:  BFU Phase 3
REG/DOL CM Contract Certified Payroll Notification
Certificate of Substantial Completion
Operations Manual Sample Table of Contents
Standard Spill Response Kit

Tab 5:  RPSU Projects
Sample, Proposal for Technical Services, Phase I
Sample, Proposal for Technical Services, Phase II and III
Sample, Construction Proposal – Power Plant and Fuel Tank
Sample, Construction Proposal – Foundation/Floor and Road Access
Certificate of Substantial Completion
Operations Manual Sample Table of Contents
Sample Drawings – Stevens Village, May 2001

Tab 6:  AEA Reports
Sample, BFU Construction Manager Monthly Report
Sample, BFU Design Engineer Monthly Report
Sample, RPSU Monthly Project Status Report

Tab 7:  Sample AEA Forms and Letters
Introduction of Bulk Fuel Upgrade Program and Request for Meeting with City
Sample, AEA CDR Transmittal Letter to Community
Sample, Community Resolution to Seek Grant Funds for Conceptual Design of Bulk Fuel Facility

Tab 8:  AEA Bulk Fuel Upgrade Project Policies and Guidelines
AEA Facility Site Control Policy
Tank Farm Design Guidelines
Heavy Equipment Policy
AEA Bulk Fuel Electrical Guidelines
Sample Design Document Panel Bill of Materials
Sample Design Document TypCard Reader Wiring Diagram
Sample Design Document TypKey Control Wiring Diagram

Tab 9:  Denali Commission Bulk Fuel Upgrade Project
            Policies and Guidelines

Tab 10: Site Control Guidelines
Scope of Work for Site Control Consultant – January 2, 2002

Tab 11: Environmental Assessment Guidelines
AEA REG Environmental Assessment Guidelines April 24,2001
AIDEA/AEA Environmental Review Checklist Instructions–Version 3/01
Code of Federal Regulations – Title 24, Part 58 (pdf)
Sample Environmental Assessmen
t-Kotlik Bulk Fuel Upgrade Project
AEA's version of NEPA "FONSI" (Finding of No Significant Impact)
CDBG Application Appendix D-Environmental Checklists-Electronic

Tab 12: Permitting Information
Bulk Fuel Upgrade Planning Permits and Notifications
Memorandum of Agreement #1 between AEA and State Fir
e Marshal 11/24/04
RPSU Operating Permits 18 AAC 50.330(pdf)
Sample RPSU Division of Air and Water Quality: Operating Permit Application (pdf)
Bulk Fuel Storage Facilities General Permit 96-7M(pdf)
EPA Guidance on Double-Walled Tanks (pdf)

Tab 13: Sample Bulk Fuel Storage Project Business Operating Plan
Sample, Bulk Fuel Business Operating Plan

Tab 14: Sample RPSU Project Business Operating Plan
Sample, RPSU Business Operating Plan


Tab 15: Training Information

Tab 16: Procurement Information
Sample AEA Rental Agreement

Hire Packet
Hire Packet Checklist
AEA Rural Energy Program, Force Account Labor, Employee Info.
Timesheet
Timesheet Cover Page
Timeline for Force Account Payroll
Force Account Payroll Planner
Direct Deposit Information
Authorization Agreement for Direct Deposits (ACH Credits)
Temporary Employment Agreement
Form W-4
Form I-9
Report of Occupational Injury or Illness

Tab 17: AEA Project Closeout Manual
AEA Project Closeout Manual - List of Contents

AIDEA
Alaska Industrial Development
and Export Authority

Blue Line

Adobe Reader

 

Thank you!
Alaska Energy Authority
813 West Northern Lights Boulevard,  Anchorage, AK 99503
907-771-3000 (Phone) 907-771-3044 (Fax) Toll Free (Alaska Only) 888-300-8534


footer

footer