Working with federal and local partners, AEA is supporting interties and power line extensions in Skagway, Hydaburg, Hollis, and the Parks Highway locations. Alaska Power Company's (APC) Prince of Wales Island Intertie, scheduled for completion this year, will save communities over $160,000 per year in diesel fuel by extending the Island's hydroelectric grid to communities powered by diesel. In summer 2005, APC completed an intertie between Alatna and Allakaket. Drilled beneath the Koyukuk River, the project replaces an overhead connection subject to periodic washout and replacement.

_________________________________________________________
Interties
Haines-Skagway Submarine Cable Intertie Project, Final Technical and Construction Report. Details installation of 15-mile intertie project. Prepared by Alaska Power and Telephone Company, Port Townsend, WA, 1998. Report (32.4mb)
Rural Alaska Electric Utility Interties. Presents information on 171 potential interties which would serve utilities participating in the Power Cost Equalization Program. Prepared by Neubauer Engineering and Foster Wheeler Environmental Corporation for the Division of Energy, Anchorage, 1997.
Report (1.35mb)
Appendix A - Mailing List for the Letter Survey (99 kb)
Appendix B - Sample Survey Letter (49 kb)
Appendix C - Survey Letter Responses (411 kb)
Appendix D - List of Telephone Survey Contacts (152 kb)
Appendix E - Telephone Survey Records (2.47mb)
Appendix F - Intertie Data Sheets, Part 1 (2.34mb)
Appendix F - Intertie Data Sheets, Part 2 (2.30mb)
Appendix G - Annotated Bibliography of Key Documents (444 kb)
Transmission Intertie Feasibility Design and Cost Estimate for Bethel-NYAC Intertie. Prepared by FPE Roen Engineers for Division of Energy, Anchorage, 1996. Report (16.1mb)