AEA Home
AEA Programs
Publications
Events
Statutes & Regulations
Board of Directors
Contacts
Press
FAQ's
Links

Rural Energy Group Bulk Fuel Upgrade Program/Rural Power System Upgrade Program Project Reference Manual

(Please note: These links will take you to a site that will ask for a password. When the password prompt comes up just click your "enter" key, do not type in a password. (It may be necessary to minimize your internet screen to view the password prompt notice.)

Many of the following files are quite large and may take a bit of time to download.

Project Reference Manual Update Log

Tab 1:  Overview
          
Bulk Fuel Upgrade Projects Flowchart
          
Sample Bulk Fuel Upgrade Project Activity Checklist
          Sample RPSU Project Activity Checklist
          Proposed Statement of Work–Multi Disciplined Engineering Services
          
Bulk Fuel Upgrade Projects Diagram

Tab 2:  BFU Phase 1
          
Sample, Proposal for Technical Services, Phase I -- (Attachment)
             Conceptual Design Report – Sample Table of Contents
             Rural Energy Cost Estimates, October 14, 2002, Version 2
             Sample, AEA Project Estimate Form
             Sample, Construction Cost Estimate
             Sample, BFU Budget Estimate
             Statement of Conformance & Variance w/ Denali Commission Policies

Tab 3:  BFU Phase 2
          
Proposal for Technical Services, Phase II & III -- (Attachment)
          Construction Management Statement of Services for Solicitation
AEA-              02-003
          Sample, Construction Management Budget Estimate
             Construction Cost Estimate & Schedule w/ Attached Letter of              Commitment to Budget & Schedule
             Sample Construction Manager Design Review Report
             Sample, Denali Training Fund Proposals Part 1
             Sample, Denali Training Fund Proposals Part 2
             Prototype Drawings

Tab 4:  BFU Phase 3
          REG/DOL CM Contract Certified Payroll Notification
             Certificate of Substantial Completion
             Operations Manual Sample Table of Contents
             Standard Spill Response Kit

Tab 5:  RPSU Projects
          Sample, Proposal for Technical Services, Phase I
             Sample, Proposal for Technical Services, Phase II and III
             Sample, Construction Proposal – Power Plant and Fuel Tank
             Sample, Construction Proposal – Foundation/Floor and Road Access
             Certificate of Substantial Completion
             Operations Manual Sample Table of Contents
             Sample Drawings – Stevens Village, May 2001

Tab 6:  AEA Reports
          Sample, BFU Construction Manager Monthly Report
             Sample, BFU Design Engineer Monthly Report
             Sample, RPSU Monthly Project Status Report

Tab 7:  Sample AEA Forms and Letters
          Introduction of Bulk Fuel Upgrade Program and Request for Meeting              with City
             Sample, AEA CDR Transmittal Letter to Community
             Sample, Community Resolution to Seek Grant Funds for Conceptual            
 Design of Bulk Fuel Facility

Tab 8:  AEA Bulk Fuel Upgrade Project Policies and

Guidelines
          
AEA Facility Site Control Policy
             Tank Farm Design Guidelines
             Heavy Equipment Policy

             AEA Bulk Fuel Electrical Guidelines
             Sample Design Document Panel Bill of Materials
             Sample Design Document TypCard Reader Wiring Diagram

             Sample Design Document TypKey Control Wiring Diagram

Tab 9:  Denali Commission Bulk Fuel Upgrade Project Policies & Guidelines
          
Rural Alaska Energy Infrastructure Criteria for Sustainability
             Cost Containment Policy for Energy Projects
             Draft Private Enterprise Policy
             Bulk Fuel Pipelines & Dispensers Policy
             Energy Project Design Capacity Policy
             Energy Project Prioritization Policy

Tab 10: Site Control Guidelines
           Scope of Work for Site Control Consultant – January 2, 2002

Tab 11: Environmental Assessment Guidelines
              AEA REG Environmental Assessment Guidelines April 24,2001
              AIDEA/AEA Environmental Review Checklist Instructions–Version 3/01
              Code of Federal Regulations – Title 24, Part 58 (pdf)
              Sample Environmental Assessmen
t-Kotlik Bulk Fuel Upgrade Project
              AEA's version of NEPA "FONSI" (Finding of No Significant Impact)
              CDBG Application Appendix D-Environmental Checklists-Electronic

Tab 12: Permitting Information
           Bulk Fuel Upgrade Planning Permits and Notifications
              Guide to the Alaska Coastal Management Program (pdf)
              Coastal Project Questionnaire (CPQ) Consistency Review Instructions
              Coastal Project Questionnaire
              Memorandum of Agreement #1 between AEA and State Fir
e Marshal               11/24/04
              RPSU Operating Permits 18 AAC 50.330 (pdf)
              Sample RPSU Division of Air and Water Quality: Operating Permit               Application (pdf)
              Bulk Fuel Storage Facilities General Permit 96-7M(pdf)
              EPA Guidance on Double-Walled Tanks (pdf)

Tab 13: Sample Bulk Fuel Storage Project Business Operating Plan
            
Sample Single Participant Business Operating Plan
                Appendix A - Statement of Qualifications
                Appendix B - O&M and R&R Cost Estimate
                Business Plan Narrative
                Financial Tables
                Grant Agreement
                Invested Escrow Agreement 
                O&M Agreement
                Secondary Operator Agreement
                Site Control Documents
                Sample Operations & Maintenance Agreement for Multiple Participant                 Projects

Tab 14: Sample RPSU Project Business Operating Plan

            Sample, Business Operating Plan of the City of Golovin Electric                 Utility Upgrade
              Appendix A - Statement of Qualifications
                Appendix B - Power Plant OM Costs
                Cover Page Grey
                Financial Tables
                Grant Agreement
                Insurance Quote (pdf)
                Invested Escrow Agreement
                Plan Narrative
                Secondary Operator Agreement


Tab 15: Training Information
           AIDEA/AEA REG Training Guidelines – October 17, 2001, Version 2
              Denali Training Fund – Grant Application Packet
              A Review of Rural Alaska Bulk Fuel & Electric Utility Operations &               Maintenance Training Resources
              B&W Training Inventory Draft 3-15
              Training Review Cover
              Training Review Table of Contents

Tab 16: Procurement Information
          AEA REG Procurement Procedures -- October 25, 2002, Revision 4
             Sample AEA Rental Agreement

           Hire Packet
           Hire Packet Checklist
           AEA Rural Energy Program, Force Account Labor, Employee Info.
           Timesheet
           Timesheet Cover Page
           Timeline for Force Account Payroll
           Force Account Payroll Planner
           Direct Deposit Information
          
Authorization Agreement for Direct Deposits (ACH Credits)          
               Temporary Employment Agreement       
           
               Form W-4 2008
               Form I-9
               Report of Occupational Injury or Illness


Tab 17: AEA Project Closeout Manual
            AEA Project Closeout Manual - List of Contents
           

 

To view & print PDFs in the menu, you will need to download Adobe Acrobat Reader. To download, click on the Adobe logo to the left.

Home | AEA Programs & Projects | Publications & Applications | Items of Interest | Statutes & Regulations | Board of Directors
Contacts | Press Releases & Public Notices | FAQs | Links    


813 West Northern Lights Blvd.    Anchorage, AK 99503
(907) 771-3000    Fax (907) 771-3044  Toll Free (Alaska Only) 888-300-8534